![]() |
Would You Drive This ANYWHERE?
1 Attachment(s)
Here is some prime pork-barrel fodder..
We don't need liberals making monkey jokes,, when we do a better job ourselves... If this reads correctly,, 500k USD each??? I think I shall invent the P50 can opener,, @ 25 USD each,, it's a steal... Quote:
The Canadians have their own problems with their Gators: http://www.deere.com/en_US/ProductCa...M=HO&link=enav http://www.cbc.ca/world/story/2007/0...ghan-nato.html I also want to be the sole source for those Twelve(12) two(2) tonne tie-down shackles used on the Gator,, @ 100 USD each... Can you say "I'm Retired"... :D God Bless the Marines... PS: I'll not argue the requirements,, it's the cost of execution... |
it looks like it would do great for doing police call on disney drive......
|
Step & Rails
Quote:
Remember the old mule the 82nd had for hauling ammo, flat bed with a small motor, seat and steering wheel stuck on the side? Looks like they just took that concept and upscaled to a jeep. Next thing ya' know the Gamma Goat will be making a comeback. |
THAT's where my lawn mower went!
:rolleyes: |
Quote:
I remember the Mule, that was sort of fun. What I miss is the M151A1! (It is getting FOGGY, again.:o I also remember the M114!:eek:) |
Quote:
|
"According to the Marine Corps Times, a Pentagon inspector general report also recently found problems in the procurement process."
I'm shocked!!! :rolleyes: Looks a lot like a two-seater sports model of an M151 developed by those Orange County Chopper guys to me. :p Richard's $.02 :munchin |
1 Attachment(s)
For all you hi-speed air-softy's in the fast lane...
You can get you very own Growler, in kit form for just 3 easy payments of $2500 USD, and for a limited time only,, you'll get not 1, not 2, but 5 Sham-WOW in MARPAC cam-u-fudge. https://www.shamwow.com/ver8/index.asp Quote:
|
Wow! Tactical Golf carts?!?! And sham-wow is included! What a bargain!! :D
|
At the high end, there's a $14,500 upgraded "tactical dune buggy" with a "bikini top."
Would this be Grace Jones in a sham-wow swim suit? :eek: Richard's $.02 :munchin |
I've seen most of the briefings for this. It's all they claim - and less! The story is much more complicated than the MSM can communicate in sound bites/bytes. Their bottom line is pretty much on target though - it's a capability looking for a mission. I've read several position papers/briefings denying it's parentage and vigorously attacking anyone who dared call it a jeep.
|
International Harvester should just bring back the Scout, and adapt it for military use. A camo SS-II with gun mounts.
It's a shame about the IFAV. |
Quote:
Something they knew when they bought the damn things.:rolleyes: It has a lot of other problems and limitations that will be brought to light over the next 50 years. Pay no attention to the man behind the curtain.... TR |
Power behind the Growler
2 Attachment(s)
I found an interesting, but old article that seems to be related to this vehicle.
http://www.abovetopsecret.com/forum/thread99317/pg1 Quote:
I looked on the manufacture's website, but could not find anything on it being a hybrid. http://www.capitaldefense.com/AmericanGrowler.shtml Early concept vehicle, Shadow RST-V Attachment 11303 Growler with mortar trailer Attachment 11304 |
Before I went Special Forces I was a "Paratrooper" airborne infantry.
After we jumped out of those wonderful airplanes guess what we did? Walked, everywhere. If it's got wheels or tracks it beats walking. TS |
PR31C - First picture is a JLTV prototype. Completely different. JLTV is an evolving program intended to replace Hummers within the next 10-12 years. It has already sucked up millions without meeting milestones. With luck, that program will be delayed indefinately by the current economic crisis (unless some congressional slimeball sells it as a jobs - read corporate welfare - program). Hybrids were/are one of the propulsion options under consideration. They are NOT ready for prime time. Once again the military budget is seen as a resource to further congressional largess.
|
I hate to talk down about a company that is veteran owned, and employs local folks...however I've heard that there were some questions as to the impartiality and objectivity in the trials.
The serious issues I read of include: A. It gets stuck just showing it a picture of a 'real' mud hole. B. It had some issues getting in the -22... IIRC the crew had to roll the mortar/trailer into the bird, then back the 'Jeep' in, then attach... it was unable to back the trailer in first. or of it were loaded straight on, it couldn't back out? I looked for the references to these issues but came up dry... That all said, I'd flog one through some Uwharrie & Upper Tellico trails, and like the TS says, it beats walking... (Until ya sink it, break it, or abandon it... and you're the one on the hand receipt ;) ) Also the majority of the hi-dollar price tag was wrapped up in the mortar & doo-dads for the 0341 crew. Edit-> Here is what I was refering to: "The biggest problem for EFSS development, though, is that its 76-inch base width made it too wide for the Osprey. The design was modified to make the mortar fit, but in such a way that it requires the crew spend five to 10 minutes reconfiguring it after unloading, plus three to five minutes to re-assemble the roll-bar cage on the Growler, which is otherwise too tall to fit in the aircraft. (The Marines have said they also plan to mount a .50-caliber machine gun on the back of the Growler, raising even more engineering questions about vehicle stability and tensile frame strength.) Width, however, was the Growler's first design hurdle. The basic Frame for the M151 Jeep, which had its own well-documented roll-over problems, was about the same width as the Osprey's rear hatch, leaving no room for crew to squeeze in and secure the load. The first design called for a 48-inch width, but that was expanded to 50 inches, allowing five inches clearance on either side. ``That exacerbated the roll-over problem,' said Bicknell, a conclusion of other engineers familiar with the Growler who were interviewed by Defense Watch. ``The Marine Corps is getting something that is 10 inches narrower than the (M151) jeep, but they had to keep the same ground clearance. Irrefutable laws of physics tell us that this raises the center of gravity, and that increases the tendency to roll over. ``When the Growler rolls over – and it will – it's going to injure and kill Marines,' said Bicknell. ``It's fairly short, almost a square vehicle. But to be stable, a vehicle has to be longer than it is wide. The Marines can't make it any longer because then it wouldn't fit in the Osprey with the towed mortar or the ammo trailer.' As is presently configured, the Growler offers very little protection to its occupants. Heavy armor is out because it would make the Growler too heavy to haul in the Osprey. The best the Marine Corps can hope for, said Jim Mills, a retired Army Special Forces soldier who led the program to develop heavier armor for the Humvee, is to protect the occupants from small arms fire and grenades. There is virtually no way, he said, to protect the Growler from a road mine or an improvised explosive device commonly used in Iraq. Under current military safety rules, according to USA Today, the Growler would not be authorized for use in Iraq except on an already-secured compound. Bicknell said he thinks the Marine Corps chose the Growler before designs were even sought and ``went through the motions' of evaluating other design prototypes. ``Their mind was made up before the proposal was made,' said Bicknell. ``That's the only explanation that makes sense as to why the Growler was chosen.' As evidence, he pointed out that several design requirements were watered down or eliminated entirely during design competition that otherwise would have eliminated the Growler. The ability to drive over a 15-inch obstacle was deleted, as was the requirement that the vehicle be able to tow 53 percent of its own weight from a dead stop on a hard, dry road surface. Another engineer interviewed by Defense Watch, who asked not to be quoted by name, said the Growler was allowed by Catto's command to retake portions of the evaluation test it initially failed. For instance, the automotive engineer said that Growler failed a transportability demonstration at Patuxent River Naval Air Station in September 2004. Passage of that test was supposedly required before moving on to other tests, one at Twenty-nine Palms and the other at the Neveda Autmotive Test Center. The Growler's demonstration team had unacceptable difficulty loading and unloading the Growler on the Osprey. The short wheel base made backing a trailer difficult, so the Marines devised a system to winch the trailer in, rear end first, and then back in the Growler and hook up the trailer once inside the aircraft. According to that source, the Growler team was allowed ``a re-do,' a chance to retake the transportability test with none of the other competitors present. ``Call it a Growler, call it a Catto Cart, call it what you want,'; said Bicknell, ``but this thing is a piece of crap and there's no other way to say it. It is going to put brave young Marines at an unacceptably high risk of injury or death and that ought to be a crime.' James Pate is the Deputy Editor for Defense Watch. Hecan be reached at jameslpatejr@adelphia.net (jameslpatejr@%20adelphia.net) Please send comments to DWFeedback@yahoo.com (DWFeedback@yahoo.com) |
Walking
Quote:
Commander's reply "We'll walk" SGM's reply "See that sky glow off on the horizon? Thats where we'll be." And there we went, in our trucks. Pete First time I ever saw a ROPU unit attached to an SF Company. If we had the Corps Bread Detachment we'd have been set. |
Quote:
GB TFS :munchin |
This thing reminds me of the old joke about how government contracting works.
Three contractors are bidding to fix a broken fence at the White House. One is from New York , another is from Tennessee, and the third is from Florida. All three go with a White House official to examine the fence. The Florida contractor takes out a tape measure and does some measuring, then works some figures with a pencil. "Well..." he says, "I figure the job will run about $900...$400 for materials, $400 for my crew, and $100 profit for me." The Tennessee contractor also does some measuring and figuring, then says, "I can do this job for $700...$300 for materials, $300 for my crew, and $100 profit for me." The New York contractor doesn't measure or figure, but leans over to the White House official and whispers, "$2,700." The official, incredulous, says, "You didn't even measure like the other guys! How did you come up with such a high figure?" The New York contractor whispers back, "$1000 for me, $1000 for you, and we hire the guy from Tennessee to fix the fence." "Done!" replies the government official. On another note, I was on a composite SCUBA ODA OPCON to NOSC to test the MARS inflatable boats and silent running outboard motors. Half of the boats were kevlar and half were neoprene. However, all were made under govt contract by a firm called West Virginia Rubbercrafters who had never made such a boat prior to this--they normally manufactured inflatable swimming pools, individual floating pool rafts, inflatable pool toys, etc. They got the contract under the rules that a % of all govt contracts had to go to minority, non-competitive, small businesses. We had trouble from the git go with the quality of the boats--e.g., transoms coming off during high-speed OTH transits at 26 kts, problems with the automatic-inflation systems after a Limp Duck or lock-out from a sub--and, although the concept was a good one, recommended they be built by either Zodiac or Avon...even if the cost was a bit higher. Seems as if some things never change...no matter how much you hope! ;) Richard's $.02 :munchin |
TS Wrote: Before I went Special Forces I was a "Paratrooper" airborne infantry. After we jumped out of those wonderful airplanes guess what we did? Walked, everywhere.
If it's got wheels or tracks it beats walking. TS An old Tanker explained it to me, this way. . . "EVERYbody love da Armahh, da Finace love the Armahh -- we keep the enemy away from da money. Da Artillery love the Armahh -- we keep the enemy away from the cannons. Da Air Force love the Armahh -- we keep the enemy away from the runway. But the Infantry love the Armahh da best. Da Infantry love to ride on da Armahh! (The M60 series and every tank before it came with what was called the grunt rail. Used to hold on to when the tankers didn't have their muddy overboot crammed into them) |
Everybody love da Armahh...NOT.
Quote:
Personally, I'm glad I ignored his advice and did it my way. Richard's $.02 :munchin |
| All times are GMT -6. The time now is 04:00. |
Copyright 2004-2022 by Professional Soldiers ®