Richard
08-01-2012, 09:51
Interesting read - especially the running comments to the author's concerns.
Richard :munchin
The Expeditionary... Army
InfoDissemination, 30 Jul 2012
The Army is planning for a significant portion of the prepositioned stocks to be afloat, an effort that would include eight ships. Two vessels would be dedicated to munitions, with one assigned to the Pacific and one to the Middle East.
The other six ships, which could be sailed to conflict zones as required, would carry equipment for an infantry brigade with MRAPs, and a sustainment brigade. The vessels would carry equipment necessary for transforming a commercial port into a dock that could load and unload military equipment.
http://www.informationdissemination.net/2012/07/the-expeditionary-army.html
Richard :munchin
The Expeditionary... Army
InfoDissemination, 30 Jul 2012
The Army is planning for a significant portion of the prepositioned stocks to be afloat, an effort that would include eight ships. Two vessels would be dedicated to munitions, with one assigned to the Pacific and one to the Middle East.
The other six ships, which could be sailed to conflict zones as required, would carry equipment for an infantry brigade with MRAPs, and a sustainment brigade. The vessels would carry equipment necessary for transforming a commercial port into a dock that could load and unload military equipment.
http://www.informationdissemination.net/2012/07/the-expeditionary-army.html